International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 13 : Meeting 2009-01-12 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 13  C (2009-01-12) 

ITU-T SG 13

Future networks including mobile and NGN

Study Period 2009

Meeting  from 2009-01-12 to 2009-01-23

held in Switzerland [Geneva]

Other Meetings : 2012-06-04  2012-02-17  2012-02-06  2011-10-10  2011-05-20  2011-01-17  2010-09-16  2010-04-19  2010-01-29  2009-09-02  2009-05-22 

Results:15 total items.
Contributions  [ Source: China Mobile ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 175 ]  
 
Proposed modifications to clauses 7.2.2 and 7.2.3 of Y.MMCF     China Mobile, Huawei Technologies Co., Ltd.   Q5/13   2009-01-08
[ 138 ]  
 
Proposal for additional text on routing optimization consideration for handover     China Mobile, Huawei Technologies Co. Ltd   Q5/13   2009-01-07
[ 133 ]  
 
Some modifications to the scenarios and flows of Y.MMCF     China Mobile, Huawei Technologies Co., Ltd.   Q5/13   2009-01-07
[ 125 ]  
 
Clarifications of the role of the Proxy Mobility Location Management Function (P-MLMF) in Y.MMCF     China Mobile, Huawei Technologies Co., Ltd.   Q5/13   2009-01-07
[ 123 ]  
 
Location of mobility service profile in Y.MMCF     China Mobile, Huawei Technologies Co., Ltd.   Q5/13   2009-01-07
[ 118 ]  
 
Clarification of the role of the HDF in Y.MMCF     China Mobile, CATR, Huawei Technologies Co., Ltd.   Q5/13   2009-01-07
[ 115 ]  
 
Proposal of New Work Item on the Scenario of Multi-connection Architecture (Q.SCEN-MCA)     Huawei, China Mobile   Q9/13   2009-01-06
[ 113 ]  
 
Proposed work item for Requirements and capabilities of ITU-T DSN     China Mobile   Q19/13   2009-01-06
[ 112 ]  
 
Proposed work item for requirement of multi-connection     China Mobile   Q9/13   2009-01-06
[ 111 ]  
 
Proposed work item for architecture of multi-connection     China Mobile   Q9/13   2009-01-06
[ 110 ]  
 
Proposed Study Roadmap for Q9 (Multi-Connection Question)     China Mobile   Q9/13   2009-01-06
[ 109 ]  
 
Proposed Study Roadmap for Q19 (DSN)     China Mobile   Q19/13   2009-01-06
[ 108 ]  
 
Proposed Scope of Multi-connection Question     China Mobile   Q9/13   2009-01-06
[ 107 ]  
 
Proposed scope of DSN     China Mobile   Q19/13   2009-01-06
[ 106 ]  
 
Proposal for information flow for IMS based handover control     China Mobile, Huawei   Q8/13   2009-01-06
Results:15 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-29